Garvey to provide Facade Retention for historic Local landmark

Garvey Demoliiton have been instructed to undertake the propping and precision demolition of a iconic local land mark.  The front elevation of the building will be retained with purpose designed propping systems allowing the remaining structure to be removed.  The devloper will then “Key” the new building into the retained structure and the propping  will then be taken away.

 

No comments yet.

Leave a Reply